our projects

Lake Country Power

New Lake Country Power Corporate HQ office building including vehicle storage and mechanics bays. New electric hot water heating plant with infloor heating, hot water unit heaters, AHU's, ductwork, vehicle exhaust systems, and a design build geothermal system, new plumbing fixtures and equipment, and over 400 feet of trench drain.

Grand Rapids East and West School

2 New 107,554 square foot identical elementary schools running concurrently. Each school contained a new commercial kitchen, complete hydronic and forced air heating systems with new boiler plants, perimeter radiation, unit heaters and cabinet unit heaters, classroom sinks with bubblers and bathrooms plubming fixtures and associated equipment, and new temperature control systems.

Greenway School

Plumbing and heating renovation project consisting of classroom and bathroom remodels, removal and replacement of the hot water heating boiler plant, HVAC upgrades, and Fire Suppressions Upgrades

Moose Lake School

New 137,870 square foot K-12 school consisting of a commercial kitchen, science labs, bathrooms and locker rooms, hot water heating plant for infloor heat, air handling units, radiation, and Trox Displacement Terminal Units, roof mounted solar water panels, chiller and chilled beam. ​

MIB School

43,310 square foot addition to the elementary school with a 115,000 square foot remodel of the remaining school. New commercial kitchen with a cafe, new hot water heating plant with perimeter radiation, bathrooms and locker rooms with associated fixtures and equipment, new air handling units and ductwork, and temperature controls upgrades.

HCC Boiler

Hydronic heating plant replacement including associated controls.

Cook Public Works

New 92,849 square foot joint public works facility with offices, heated vehicle storage, mechanics bays, new hot water heating plant with infloor tubing, hot water unit heaters, underground heating mains, new outdoor LP gas system with vaporizers, MAU's vehicle exhaust, all new temperature controls, over 400' of trench drains with a 1,500 gallon flammable liquid interceptor buried 12' deep inside the building, new compressed air system, new plumbing with fixtures and associated equipment and an existing admin building remodel.

We work hard
for your satisfaction!